Questions On The Code > Construction Specifics

New Workshop & Display

<< < (2/2)

NiMo:
Turns out the 8 space panel that I was going to use as my switch controller will wind up becoming a second sub panel, but will be used exclusively for the workshop needs.  I got a 30 amp double pole for the first subpanel and will be wiring that up soon to the main.

NiMo:
UPDATE!!!

Got much of the major electric done.  My father is insisting (and rightly so) that I bring in a pro to inspect my work and supervise/assist in the hookup of the subpanel to the main panel.  All that will be left is the fixture wiring and switch controllers (have to get the covers which I did not in my original purchase).

Navigation

[0] Message Index

[*] Previous page

Go to full version