Last additions - Controller Upgrade Project |
Coldwater, MI General Electric Four Way Haul.293 viewsbasilicon89Nov 22, 2016
|
|
The brain of the traffic signal system90 viewsbasilicon89May 27, 2011
|
|
Done!! Except for BIU#2165 viewsbasilicon89May 23, 2011
|
|
EAGLE M52 Controller unit84 viewsbasilicon89May 23, 2011
|
|
SDLC lines ran, switches, and transfer relays remounted.95 viewsbasilicon89May 17, 2011
|
|
|
traffic signal controller cabinet LED interior lighting58 viewsbasilicon89Apr 30, 2011
|
|
|
Closed-Loop Interconnect66 viewsbasilicon89Apr 20, 2011
|
|
Test fitting the controller. 61 viewsbasilicon89Apr 16, 2011
|
|
|
|
|
|
|
|
|
|
|
|
|