Gallery of Lights


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > basilicon89 > Controller Upgrade Project
New Backpanel Installed
All thats left are the SDLC data lines, I/O for the detectors and wire up the signals. This was a bear to install.
Keywords: Traffic_Lights

New Backpanel Installed

All thats left are the SDLC data lines, I/O for the detectors and wire up the signals. This was a bear to install.

IMAG1445.jpg 1902843_377229659084657_429463262_n.jpg IMG_0229.JPG IMAG0207.jpg Melted_MV_lamp_ignitors_062.JPG
File information
Filename:IMG_0229.JPG
Album name:basilicon89 / Controller Upgrade Project
Keywords:Traffic_Lights
Filesize:1031 KiB
Date added:May 16, 2011
Dimensions:3000 x 2250 pixels
Displayed:91 times
Color Space:sRGB
DateTime Original:2011:05:16 00:21:30
Exposure Bias:0 EV
Exposure Mode:0
Exposure Time:1/60 sec
FNumber:f/2.8
Flash:Red Eye, Auto-Mode
Focal length:6 mm
ISO:200
Make:Canon
Max Aperture:f/2.8
Model:Canon PowerShot SX100 IS
URL:http://www.galleryoflights.org/mb/gallery/displayimage.php?pid=6500
Favorites:Add to Favorites

Comment 1 to 2 of 2
Page: 1

rjluna2   [May 16, 2011 at 11:56 AM]
I see you are making a very good progress Cool
basilicon89   [May 17, 2011 at 04:15 AM]
Yes. All the switches were mounted and power was applied. MMU and Eagle M50 are communicating. Right now the issue is the BIU interfacing with the backpanel

Comment 1 to 2 of 2
Page: 1