Gallery of Lights


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > basilicon89 > Eagle's Austin Facility
Wiring terminal facilities
This lab is wiring up the terminal facilities that will eventually find their way into the bottom half of cabinets all over the nation. 
Keywords: Traffic_Lights

Wiring terminal facilities

This lab is wiring up the terminal facilities that will eventually find their way into the bottom half of cabinets all over the nation.

Cabinet_Backpanel_Assembly.jpg DuraSig_backstock.jpg DuraSigs_Assembly.jpg Factory_Floor.jpg Mark_IV_oven.jpg
File information
Filename:Cabinet_Backpanel_Assembly.jpg
Album name:basilicon89 / Eagle's Austin Facility
Keywords:Traffic_Lights
Filesize:50 KiB
Date added:Jan 02, 2011
Dimensions:638 x 438 pixels
Displayed:238 times
URL:http://www.galleryoflights.org/mb/gallery/displayimage.php?pid=4494
Favorites:Add to Favorites